Search
Close this search box.

Engineers worked overnight at Folkestone to switch on the first Southern Region signal box equipped with a ‘domino’ type panel. Twelve miles of the busy express and boat train line from Ashford to Folkestone will be controlled by the box, which replaces 8 manual boxes and enables trains to run at higher speeds on busy lines.