Telegraph ship Monarch finished laying the second telephone cable between Abbot’s Cliff, 3 miles west of Dover and Sangatte, 4 miles west of Calais. The cable is 24 miles in length and contains two separate metallic circuits. The Monarch was the first purpose built cable ship for the GPO, launched in 1883.